The facility also has 125 dock doors to receive trucks for food delivery and shipment. The building work included concrete foundations, CMU walls, steel structural columns and steel bar joists roof framing, insulated metal wall panels, single-ply roofing membrane, interior concrete floor slabs and exterior concrete slabs and walkways. Sitework included grading, paving, utilities, erosion control and parking lot landscaping.