Star WWTP

ESI is currently self-performing the installation of 775,000 lbs of reinforced steel for a headworks building, effluent building and MBR blower building.

The Project consists of improvements to the wastewater treatment plant involving construction of concrete and masonry structures. This includes the installation of headworks equipment, process basins, MBR basins, pumps, mixers, blowers, diffused aeration, membrane systems, chemical feed systems, UV equipment, pump station equipment, generator, and appurtenant work.