ESI served as the general contractor and construction manager for a 54,764 square-foot addition to an existing UPS distribution center. The building was erected using concrete tilt-up panels, wood joist, and a panelized roof structure. Along one side are four run-out buildings, each over half a football field in length, assembled with masonry blocks and a panelized roof structure similar to that of the main building. The full shell of the building boasts an extensive overhead door system totaling over 270 doors; making it one of the most perforated projects ESI has encountered.